Offering 1: The PACE Agent Assistant — Production Planning, Estimating Intake & Cross-Plant Scheduling
Classification: CONFIDENTIAL — Cogneris Offering Specification & Discussion Paper
Client Target: The Lowe-Martin Group / LMX Solutions (Ottawa & Mississauga Operations)
Date: 2026-11-18
Version: 1.0
1. Executive Summary
ePS Pace (formerly EFI Pace) is a robust print and packaging MIS/ERP once a job is cleanly defined, costed, and released to production. However, the highest-friction work in a multi-division enterprise like Lowe-Martin happens around PACE:
- Before PACE Calculating (Planning & Estimating Intake): Translating unstructured customer emails, PDFs, packaging dielines, and multi-lot RFQs into complete, valid production specifications; detecting missing details before an estimator wastes 45 minutes; checking historical actuals on similar jobs; and selecting the right production pathway across Ottawa and Mississauga.
- Across PACE & Plant Scheduling (Scheduling & Delivery Risk): Bridging the visibility gap between commercial promise dates and shop-floor schedule reality (in PACE Scheduling or PrintFlow 4D), where paper/board PO arrivals, proof approvals, press load, bindery bottlenecks, and LMX Solutions kitting lines determine whether an SLA is met or missed.
The PACE Agent Assistant is an intelligent planning, estimating-intake, and scheduling co-pilot that connects directly to Lowe-Martin's PACE environment. It never bypasses or replaces PACE's costing engine or plant schedulers. Instead, it prepares validated draft estimates inside PACE, cross-checks historical job performance, and exposes live capacity and delivery-risk intelligence to Estimators, Planners, CSRs, and Account Executives.
2. Architectural Principle: Working With ePS Pace, Not Against It
Many generic software integrations fail with ePS Pace because they attempt to calculate print/packaging costs externally or insert raw object rows directly into PACE without triggering its internal business rules. Our architecture respects PACE's native engineering:
(EstimateRequest / CloneObject / calculateEstimate)"] P2["PaceConnect Event Webhooks
(XML / JSON Inbound & Outbound Triggers)"] P3["Read-Only PostgreSQL Analytics Views
(Historical Estimates, JobCosts, Inventory, POs)"] P4["PACE Scheduling (JobPlan) /
PrintFlow 4D APS Engine & Auto-Count 4D"] end E1 & E2 --> A1 A1 --> A2 --> A3 A3 -->|"Draft Estimate Creation"| P1 P3 -->|"Fast Read Context"| A2 & A4 P2 -->|"Status & Exception Events"| A4 E3 --> A4 A4 <-->|"Capacity & Constraint Queries"| P4
Why This Architecture Is Safe for Lowe-Martin's Plant
- PACE Always Calculates the Estimate: The agent populates
EstimateRequest/ Product Templates (JobProductType) (the same underlying engine used by PACE EasyQuote) or usesCloneObjectfrom a verified reference estimate followed byInvokeAction(calculateEstimate). PACE's own press speeds, spoilage tables, makeready standards, and paper weight formulas perform every cost calculation. - Human Estimator Approval Gate: Every AI-prepared estimate lands in PACE in a designated
Draft — Pending Estimator Reviewstatus with an itemized assumption sheet. No quotation is released to a customer or converted to a live job (convertToJob) without human sign-off. - Read-Safe Scheduling Integration: When querying or simulating schedules against PACE Scheduling (
JobPlan) or PrintFlow 4D, the assistant operates in read/simulation mode by default—never overwriting the master schedule board without an explicit planner action.
3. Module 1A: Intelligent Production Planning & Estimating Co-Pilot
3.1 Automated Spec Extraction & The "Missing-Spec Gate"
Incoming requests for Commercial Print, Folding Cartons/Packaging, Direct Mail, Wide-Format Signage, and LMX Kitting frequently omit critical manufacturing parameters.
- How It Works:
- Reads emails, attached PDFs, Excel bid tabs, and CAD/dieline notes.
- Validates extracted attributes against the required schema for the target PACE
JobProductType(e.g., 16pp Saddle-Stitched Booklet, Tuck-End Folding Carton, Variable-Data Postcard Mailer, Multi-Component LMX Kit). - Flags Missing or Contradictory Specs Immediately:
- Example 1 (Packaging): Client specifies "18pt SBS carton with soft-touch aqueous and foil stamp" but omits flat/finished dimensions, glue-flap type, or packing count per master shipper.
- Example 2 (Commercial Booklet): Client specifies "20 pages saddle-stitched" (not divisible by 4-page signature multiples) or omits whether cover stock is self-cover vs. plus-cover.
- Example 3 (Direct Mail): Client requests "100,000 personalized mailers" without specifying Canada Post Smartmail sortation level (Postal Code Targeting vs. Personalized Mail), envelope window specs, or variable-data ink coverage.
- One-Click Clarification Draft: Generates a concise, technically accurate email/portal reply for the rep or CSR to send to the client before the request consumes estimator queue time.
3.2 Historical Job Look-Alike & "Estimated vs. Actual" Margin Guard
A common source of margin erosion in print and fulfillment is repeating an historical estimate whose assumptions failed on the shop floor.
- How It Works:
- Searches PACE's PostgreSQL historical records (
Estimate,Job,JobPart,JobCost,ActivityCode) for the top 5 closest completed jobs by product type, substrate, run length, finishing operations, and customer. - Compares Estimated Hours/Materials vs. Actual Auto-Count / Shop-Floor Data Collection (
JobCost): - "Alert: On 4 prior jobs using 24pt C1S board with heavy dark-blue flood coat on this press, actual washup/makeready averaged +35 minutes and spoilage ran 4.2% above standard table. Recommend estimator review waste allowance."
- "Alert: Similar LMX 6-item healthcare kit required 22 seconds/kit hand-assembly actual vs. 15 seconds estimated."
3.3 Multi-Plant & Multi-Pathway Production Planning (Ottawa vs. Mississauga)
With major production facilities in Ottawa and Mississauga and capabilities spanning offset, digital, wide-format, and lettershop, estimators often need to evaluate production alternatives:
- Automated Variant Comparison in PACE:
- Prepares multi-pathway PACE estimate variants (
EstimateQuantity/ production alternatives) so the estimator can compare side by side: - Pathway A: Run sheet-fed offset at intermediate quantity threshold vs. Pathway B: Run high-speed digital inkjet/toner for shorter run or heavy variable data.
- Pathway C: Produce in Ottawa vs. Mississauga factoring in current plant press backlog, local substrate inventory on the floor (
InventoryItem), and freight distance to the client's final distribution zones.
4. Module 1B: Live Scheduling & Delivery-Risk Assistant (PACE Scheduling / PrintFlow 4D)
4.1 Pre-Quote Promise-Date & Capacity Feasibility
Today, a sales rep often asks for a quote with a customer-requested delivery date without knowing if the bindery or kitting floor is already booked at 110% capacity that week.
- How It Works:
- Evaluates the estimated operation hours across cost centers (Prepress → Press → Coating/Die-Cutting → Bindery/Finishing → Lettershop/LMX Kitting → Shipping) against live load in PACE Scheduling or PrintFlow 4D.
- Returns a Traffic-Light Feasibility Assessment right on the estimate draft and inside Sandy CRM:
- Green (Standard Fit): Capacity available in primary plant with ≥24 hours buffer before requested ship date.
- Amber (Conditional / Cross-Plant Fit): Mississauga folder/stitcher line is booked Tuesday–Thursday; feasible if printed/finished in Ottawa or if client approves proofs by Monday 10:00 AM.
- Red (Schedule Conflict): Requires overtime approval or split shipment (e.g., partial ship 10,000 units Friday, balance Tuesday).
4.2 End-to-End Material & Prepress Readiness Watchdog
A press slot on the schedule board is useless if the paper hasn't arrived from the mill, the cutting die isn't in the rack, or the client hasn't signed off on the PDF proof.
- How It Works:
- Continuously cross-checks scheduled jobs over the next 72 to 120 hours across four PACE records:
- Scheduled Press Start (
JobPlan/ PrintFlow task start) - Paper / Substrate Availability (
InventoryItemon-hand vs. openPurchaseOrderexpected arrival) - Prepress / Customer Proof Status (
JobStatus/ approval milestone) - Tooling Readiness (custom cutting dies, embossing plates, specialty inks, or LMX customer-supplied kit components)
- Proactive Exception Alerts: Flags jobs at risk 48 hours before press time so planners can swap schedule slots smoothly instead of suffering expensive unscheduled press downtime.
4.3 "What-If" Rush Order & Schedule Disruption Simulator
When an executive account or contract SLA requires slotting an urgent job into an active shift:
- The planner asks the PACE Agent Assistant: "What happens if we slot Job #48210 (25,000 LMX retail kits) ahead of Thursday's afternoon shift in Mississauga?"
- The assistant evaluates downstream operation dependencies and identifies:
- Which existing jobs shift by how many hours.
- Whether any shifted job crosses its committed customer delivery date (
PromiseDate). - The lowest-disruption alternative (e.g., splitting bindery across two shifts or routing the commercial print component to Ottawa).
5. Concrete Lowe-Martin Workflow Walkthrough
Scenario: National Healthcare / Pharma Patient Welcome Kit (LMX Solutions + Packaging + Print)
- Request Arrives: An account executive receives an RFQ for 15,000 & 30,000 bilingual patient starter kits consisting of:
- Custom structural tuck-top mailer box (18pt SBS, 4C + matte aqueous)
- 24-page bilingual patient guide booklet (saddle-stitched, 100lb text + 80lb cover)
- 2 variable-data enrollment cards with unique barcodes
- Kitting with 1 client-supplied medical device sample + polybag + bulk distribution to 140 clinics across Ontario and Quebec.
- Step 1 — Spec & Triage (2 minutes):
- The PACE Agent Assistant parses the PDF and spreadsheet, maps the 4 components to PACE parts, and immediately catches 2 missing specs:
- Missing Spec 1: Exact dimensions and unit weight of the client-supplied medical device sample (needed for carton structural sizing, kitting rate, and freight weight calculation).
- Missing Spec 2: Split ratio between English and French kits (e.g., 75/25 vs. 80/20) for plate change and digital variable-data batching.
- Step 2 — Historical Benchmark & PACE Draft Creation (3 minutes after client confirms specs):
- Pulls 3 historical LMX healthcare kit jobs from PACE; notes that bilingual version changes on the booklet cover are 18% cheaper when ganged 2-up on sheet-fed offset while running the barcoded cards on digital press.
- Creates the multi-part PACE Estimate Draft for both 15,000 and 30,000 quantities via
EstimateRequest/InvokeAction(calculateEstimate).
- Step 3 — Live Schedule & Plant Check:
- Queries Mississauga LMX kitting line and offset press schedule: confirms press and die-cutting open next Wednesday, and LMX hand-kitting line can complete 15,000 units in 2.5 shifts starting the following Monday.
- Step 4 — Estimator Review & Approval:
- The senior estimator opens a complete, calculated PACE estimate with all 4 parts, paper stocks, historical actual comparison notes, and verified schedule window—approving the quote in 10 minutes instead of 2.5 hours.
6. Technical Integration & Governance Summary
| Integration Layer | PACE Mechanism | Purpose & Guardrail |
|---|---|---|
| Read Context & Analytics | Read-only PostgreSQL views / JDBC replica + FindObjects / ReadObject | Sub-second lookup of historical estimates, actual JobCost transactions, paper InventoryItem stock, open PurchaseOrder ETAs, and customer specs. Zero write lock on production DB. |
| Estimate Draft Creation | SOAP CreateObject / CloneObject on EstimateRequest or template Estimate + InvokeAction (calculateEstimate) | Lets PACE's native calculation engine compute all press sheets, spoilage, makeready, bindery rates, and markups. Tagged AI_DRAFT_PENDING_REVIEW. |
| Event Notifications | PaceConnect outbound webhooks / XML triggers | Real-time triggers when an estimate status changes, a proof is approved, a PO arrives late, or a job hits a production exception. |
| Scheduling & Capacity | JobPlan read API (PACE Scheduling) or PrintFlow 4D XML/DB sync boundary | Reads active machine loads, queue durations, and due-date slack. Never directly mutates JobPlan rows behind PrintFlow's back. |
7. Key KPIs for a 90-Day Pilot at Lowe-Martin
- RFQ-to-Estimate Turnaround Time: Target 50%–65% reduction in elapsed time from inquiry receipt to estimator-approved PACE quote.
- Estimator Spec-Chase Rework: Target >70% reduction in incomplete requests reaching the senior estimating desk.
- Estimate-to-Actual Cost Accuracy: Measurable reduction in unrecovered makeready, spoilage, and hand-kitting variance on complex multi-part jobs.
- On-Time Delivery / Promise-Date Accuracy: Early identification of schedule, proof, or paper-PO conflicts 48+ hours prior to scheduled press start.